Click to Home
Irvington Connect

Go To Search
Long Range Capital Plans
The Village is continually evaluating its infrastructure and equipment. To aid in financial and project planning, several long range plans have been developed to address street resurfacing, flood control projects, and equipment replacement.  The following documents are available for review:

2016 Roadway Assessment Report
Full report
Map of 5 Year Plan
Full roadway improvement map

Prioritized List of Flood Control Projects - taken from the 2011 Village-wide Flood Study Report

Capital Budget - prepared annually to address equipment, infrastructure and other large capital expenditures.