Long Range Capital Plans

The Village is continually evaluating its infrastructure and equipment. To aid in financial and project planning, several long range plans have been developed to address street resurfacing, flood control projects, and equipment replacement. The following documents are available for review:

2023 Roadway Assessment Report

Prioritized List of Flood Control Projects (PDF) - taken from the 2011 Village-wide Flood Study Report

Capital Budget (PDF) - prepared annually to address equipment, infrastructure and other large capital expenditures.